Floor Plan 1 & 2
Blue print coffee stain demo floor plan for an interior condo remodel, detailing the scope of work and notes for the project [1.1].
Project Details

Project Name: McMahon Condo Demo Floor Plan [1.1]
Location: 2940 Neilson Way, Santa Monica, CA 90405 [1.1]
Unit: #204 - Kathy McMahon Residence [1.1]
Contractor: Blanco Construction Services [1.1]
Drawing Number: A0.02 [1.1]

Demo Notes
The plan outlines several demolition tasks:

Remove all carpet and tile throughout.
Remove kitchen, master bath, and guest bath cabinets & countertops.
Remove tub/shower floor & wall tiles.
Remove master closet walls, south wing wall, and kitchen walls (refer to structural plans for details).
Remove light fixtures, lens & wood trim ceiling vault in the kitchen.
Remove tile on face of fireplace & hearth.
Fire-rated door at wall & front door will remain.
Remove and replace all toilets; existing washer/dryer will remain [1.1].

Structural & Patching Notes

Structural Note: A shear wall is to be added, and framing is to be modified per structural plans sheet S-1 [1.1].
Patching Notes:
Where new walls occur, refer to a specific detail for sill-plate construction & floor patching.
Where walls are removed, patch lightweight concrete floor flush with new concrete & patch, tape & refinish ceilings with 5/8" Type X GWB to maintain a 1-hour assembly [1.1].
Floor Plan 1 & 2 (Poster)
Floor Plan 1 & 2 - #1 (Poster)
#1

Procedures

Replacement was found, no work was performed